Groupon

GROUPON
This is a deal-of-the-day website that features discounted gift certificates usable at local or national companies.

This fit out was over six floors. All structured cabling and power had to be tested. The six floors were fully decorated and new carpet was installed. Four new kitchens were installed and the aluminium walls were moved to create new office space.

Once all the above had been completed new furniture was brought in and set up. All this work was completed on price and on schedule.

Pump Court

Pump Court
On the third floor of Pump Court the client owned half the floor and had bought the second half of the floor which they wanted refurbished.

We knocked down the wall between the two halves of the floor to make the third floor one big space. We then refurbished the common areas and the five offices within this area. Also a shower room and new kitchen was installed.

New walls were put up and plastered fully. All offices, common areas, kitchen and new bathroom were painted and decorated before and new carpet was laid.

Talk Talk

Talk Talk
This was a fairly large refurbishment with all common areas throughout the building, the rear downstairs office, main breakout area and reception all being done.

All areas were painted and decorated with new ceiling tiles throughout and new carpets.